GROUNDBREAKING CEREMONY FOR REIWA PHARMACEUTICAL ENTERPRISE PROJECT - BRVT

25 Oct 2024

On the morning of October 1st, 2024, Tan Phat Long Engineering Corporation and TTV Trade Promotion Pharmaceutical and Investment Company Limited successfully organized the groundbreaking ceremony for Reiwa Pharmaceutical Enterprise Project at Dat Do 1 Industrial Park, Phuoc Long Tho Commune, Dat Do District, Ba Ria - Vung Tau Province.

The ceremony was attended by representatives of Ba Ria - Vung Tau Industrial Zones Authority (BIZA), Dat Do 1 Industrial Park Management Board, the Employer TV TPI, the General Contractor Tan Phat Long, the Consultant Nagecco, and distinguished guests from the banks, suppliers, subcontractors and employees of Tan Phat Long Company.

Covering a total floor area of 12,700m2 with two production workshops, Reiwa Pharmaceutical Factory sets the target for reaching an annual capacity of 600 million products including powder injection lines, oral solid dosage form for oral administration such as Betalactam and non-Betalactam tablets and capsules with the operation of the powder injection line by the end of 2025. The factory will be operated with a Quality Management System that meets the "WHO Good Manufacturing Practices" (WHO - GMP) and aims to apply the "European Good Manufacturing Practices" (EU-GMP).

Addressing the ceremony, Mr. Nguyen Truc Thanh - Chairman of the Board and General Director of Tan Phat Long Engineering Corporation affirmed the commitment to ensuring progress while strictly complying with requirements on construction, labor safety and project quality standards according to the design and signed contract.

Tan Phat Long is the main D&B contractor at "Reiwa Pharmaceutical Factory" Project. This is Tan Phat Long's first project in Dat Do 1 Industrial Park and one of many projects implemented by Tan Phat Long in Ba Ria - Vung Tau Province including Highlands Coffee Roastery Factory, Charm Ming Global Factory, Dobla Chocolate Factory, Tafuco Packaging Factory, Hamptons Ho Tram Resort, and many other projects).

Some photos from the ceremony:

Overview of the groundbreaking ceremony for Reiwa Pharmaceutical Enterprise Project
Drum performance to start the ceremony
Mr. Le Viet Phuc - Deputy Head of Ba Ria - Vung Tau Industrial Zones Authority (BIZA) addressed the ceremony
Mr. Dinh Hoang Anh - Chairman of the Members’ Council of TV TPI spoke at the ceremony
Mr. Nguyen Truc Thanh - Chairman of the Board of Directors and General Director of Tan Phat Long Company addressed the ceremony
Lion dance performance
Commencement rites
Commencement rites
Ba Ria - Vung Tau Industrial Zones Authority (BIZA), Dat Do 1 Industrial Park Management Board, the Employer TV TPI, the Consultant, and the General Contractor TPL posed for a commemorative photograph
Representatives of the Employer TV TPI and the General Contractor TPL posed for a commemorative photograph
The Board of Directors of Tan Phat Long Engineering Corporation
Employees of the General Contractor TPL